Shake on Hover Animation

Demo to preview the plugin:

Introduction

The Shake on Hover Animation plugin adds subtle, fun, or attention-grabbing shaking animations to any Bubble element when hovered over. With 8 animation styles to choose from, this plugin enhances UI interactivity with no-code simplicity.
⚠️ Note: This plugin was recently acquired by Zeroqode. We’re reviewing and improving its functionality. Let us know if you run into any issues!
Key Features

Prerequisites

To start using the Shake on Hover Animation plugin in your Bubble app, make sure the following conditions are met:
  • Bubble App Ready: You have an existing app with UI elements you want to animate (buttons, icons, groups, etc.).
  • Element ID Attribute Enabled: Go to Settings → General, and make sure the “Expose the option to add an ID attribute to HTML elements” is checked.
  • Element ID Set: Assign a unique ID Attribute to the element you want to animate.
  • Animation Setup: Use the plugin’s dropdown options to select your preferred shake style.
Tip: Try different animation styles to match your UI mood—Subtle for micro-interactions, or Crazy for fun call-to-actions.
Image without caption

How to setup

Step 1: Install the Plugin

Step 2: Add the Shake Element

Step 3: Configure the Properties

Step 4: Preview the Effect

Plugin Element Properties

Shake

Fields:
Title
Description
Type
Id
Add the HTML ID of the element you want to animate (e.g., 2)
Text
Type
Select the shake animation style you want to apply
Dropdown
Ensure that the targeted Bubble element (like a button, group, image, etc.) has the same HTML ID you specify in the plugin.
Image without caption

Changelogs