Image / Logo Carousel Slider (Loop)

Demo to preview the plugin:

Introduction

Plugin lets you add an animated logo / image slider to your application.
Image without caption

How to setup

Create element on the page, configure fields “List of images URLs”, Duration, Height and Width.

Plugin Element Properties

Logo slider

Element to show animated image slider
Image without caption
Fields:
Title
Description
Type
List of image URLs
List of images to show in the slider
Text
Duration (seconds)
Speed animation
Number
Image padding
Distance between images
Number
Height
Height of the images
Number
Width
Width of the images
Number
Border radius (px)
The border radius of the image in pixels
Number
Animation direction
Available options: normal, reverse
Dropdown
Images clickable?
Open link in new tab on click
Checkbox (yes/no)
URLs to open on click
Comma separated list of URLs
Text (optional)
Stop animation on hover
Stop slider on hover
Checkbox (yes/no)
Image without caption

Changelogs