Introduction
The Flickr API Plugin allows you to integrate Flickr’s image search functionality into your Bubble application. By leveraging the Flickr API, you can dynamically search for images based on user-provided keywords and display relevant results. This plugin is ideal for applications requiring an image search feature without storing large media files.
See Key Features
Prerequisite
- Bubble Account: An active Bubble.io account is required to install and use the plugin.
- Plugin Installation: The plugin can be installed directly from the Zeroqode Plugin Store or from the Plugins section of your Bubble Editor.
- A Flickr API Key (obtainable from the https://www.flickr.com/services/developer/api/).
- Configured your API settings within Bubble, providing your Flickr API Key.
How to setup
Step 1: Obtain a Flickr API Key
Step 2: Install the Plugin
Step 3: Configure the Plugin
Step 4: Use the Plugin in Workflows
Plugin Data Calls
Search For Images by Tag
Plugin Action Calls
Get Image From URL